iLine’s Construction brief specified concrete floors, pre-cast concrete external walls, and structural steel roof framing with low pitch steel roofs. The exposed aggregate walkways with Aliclad, Eurotray and cedar weather board claddings add to the sleek aesthetic.
The project was fast tracked to an exceptionally tight timeframe of six months, and completed by iLine on time and within budget.
Built by Devcich & Co