iLine Construction delivered a new multi-million-dollar refrigerated cross-dock facility in Horotiu, north of Hamilton, for Hall’s Group, providing a purpose-built hub for the handling and distribution of temperature-controlled freight. Completed within a six-month construction programme, the project further demonstrates iLine’s expertise in specialist coolstore and cold storage construction.

The 1,800m² greenfield development comprises insulated-panel coolstores, a dedicated 400m² freezer designed to operate at -25°C, and an adjoining administration block. Designed by TEAM Architects, with engineering by Silvester Clarke, the facility provides specialist temperature-controlled environments for the efficient receipt, handling and dispatch of chilled and frozen goods.

The building incorporates six loading bays beneath a continuous canopy, a separate ramped loading entrance and a paved loading apron designed to accommodate heavy vehicle movements. The administration block includes external glazing, a covered entrance and deck, with dedicated pedestrian access.

Delivering a development of this scale within six months required careful construction planning and programme sequencing. From initial site preparation and foundations through to structural framing, insulated-panel installation and specialist freezer construction, iLine coordinated the works to achieve the required completion date.

Completed in October 2026, the project was delivered to the satisfaction of Hall’s Group, providing a modern, purpose-built facility to support their refrigerated logistics operations. The successful delivery adds another significant project to iLine’s growing portfolio of coolstore and temperature-controlled industrial developments.